Production and costs of manual delimbing, bucking, and piling in thinnings

Production and costs of manual delimbing, bucking, and piling in thinnings

4.11 - 1251 ratings - Source



Gas, oil, repair and maintenance (from Cubbage 1981) Labor costs: $5.00 per scheduled hour plus 30% fringe benefits ($6.50/ 50% utilization) Total cost per productive hour for chainsaw operation: Piling costs: $4.50 per scheduled hour plusanbsp;...


Title:Production and costs of manual delimbing, bucking, and piling in thinnings
Author: Bryce J. Stokes, B. L. Lanford, Southern Forest Experiment Station (New Orleans, La.)
Publisher: - 1986
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA